USACE East of Harvey Canal Floodwalls

East of harvey Floodwalls & Levees Contract 3

BKI prepared right-of-way documents, design reports, and construction plans and specifications for installing over 1.3 miles of reinforced concrete floodwalls, earthen levees, gates, ramps, utility relocations, and frontal protection for the Hero Pumping Station, including air suppression of horizontal pumps to prevent backflow. Also provided engineering during construction. The total construction const for this project is $65 million.