City of Slidell Drainage Plan of Action

Burk-Kleinpeter, Inc. (BKI) prepared an engineering report, complete with hydraulic and hydrologic analysis, drawings, and cost estimates for various drainage projects in the City, including the West Diversion Canal, City Barn Pump Station and collection system, Dellwood Pump Station and collection system, W-14 Canal improvements and W-14 Canal outfall pumping station, Robert Road Detention Pond, Highway 11 Detention Pond, and other individualized drainage improvements for neighborhoods with repetitive flooding problems in the City of Slidell.

In conjunction with the recommendations made for the above projects, BKI developed construction cost estimates for each and a recommended priority list of drainage improvements for the City.

The recommendations were subsequently funded through a Citywide Drainage Issue and construction of many of the projects has been completed.