BURK-KLEINPETER,
INC. was contracted by the Alabama State
Docks to provide architectural and site
engineering design for a 360,000-SF forest
products warehouse to serve the Port of
Mobile.
BKI designed the
complete demolition of the existing
warehouse and the construction of a modern
industrial warehouse. The new Pier "C"
warehouse can hold approximately 120,000
tons of forest products. The facility has
berths for three vessels and 80-foot wharf
aprons to provide ample room for handling
cargo.
BKI's architectural
design included roofing, flashing,
ventilation, door and window openings,
fire protection sprinkler system, wall
sections, finish schedules, and mechanical
and latrine facilities. The site
development included water supply and
waste water collection and transmission,
including a complete sewer lift station to
serve the Pier "C" complex.
Construction cost
was approximately $9 million
dollars.
|