Dravo Wastewater Treatment Plant Expansion

BURK-KLEINPETER, INC. was retained by St. Bernard Parish Sewer District No. 1 & 2 to design a two-million gallon a day (MGD) expansion of the existing Dravo wastewater treatment plant.

BKI designed a separate extended aeration treatment train to operate in parallel with the existing treatment plant. The project included a 12-MGD effluent pump station, effluent force main, covered sludge drying beds, an expansion of the operations and compressor building and construction of a new laboratory building. BKI also provided construction administration and resident inspection.

The construction cost was approximately $4.8 million.