Crescent City Connection Bridge East Bank Approaches

BKI was selected by the Louisiana Department of Transportation & Development to design elevated approach structures for the Lake bound, River bound and Transit lanes, and to design a transit ramp relocation on the east bank approach to the Greater New Orleans Mississippi River Bridge.

Structural design included conventional AASHTO concrete girder spans as well as both straight and curved steel plate girders for several long span girder crossings. Sequencing construction to maintain full traffic capacity of the existing Pontchartrain Expressway throughout the three construction phases was a key aspect of the design.

The new elevated lake bound traffic lanes were constructed, followed by a partial demolition of the old lake bound lanes and partial construction of the new river bound lanes, as well as the elevated transit lanes in the median. The third phase consisted of the completion of building the river bound lanes and entrance ramps towards the river.

The total construction cost for this project was $84 million.