Interstate 10 at the Causeway Blvd. Interchange

Burk-Kleinpeter, Inc. (BKI) was retained by the Louisiana Department of Transportation & Development to perform an Environmental Assessment of the I-10 corridor through Jefferson and Orleans Parishes. During the Environmental Assessment,

BKI studied various alternatives for replacing the outdated I-10/Causeway Boulevard cloverleaf interchange with direct and semi-direct ramps. This study included line and grade, capacity analysis, construction sequencing, and cost estimates of the alternatives.

BKI provided geometric evaluation of the selected alternative, a semi-directional interchange with five new elevated ramps, realignment of at-grade connector roads, and modifications to existing bridge structures. Currently, BKI is preparing preliminary plans for the new interchange, including design of at-grade roadways, drainage improvements, and elevated ramps. The ramps consist of single and multi-column bents, curved steel-plate girders, straight steel-plate girders, pre-stressed concrete AASHTO girders, and concrete deck slabs. Upon completion of preliminary plans, BKI will prepare final plans, construction sequence, cost estimates, and special provisions.

Estimated construction cost is approximately $40 million.