Brays Bayou Detention Element

Harris County Flood Control District retained Burk-Kleinpeter, Inc. to provide a drainage study for Brays Bayou from State Highway 6 east to the Sam Houston Tollway.

BKI used the UNET Hydraulic Network Computer Model to evaluate the Project Design Memorandum prepared by the U.S. Army Corps of Engineers in 1997 and analyze existing land areas along the bayou to determine necessary preliminary storage volumes and control structure designs (storm water detention elements) to improve the hydrologic and hydraulic conditions of the bayou. The analysis was based on a 100-year frequency flood event. BKI also prepared a report presenting the conceptual design of each of the detention facilities, control structures, channel modifications and erosion protection.

The project determined if three already acquired detention sites were sufficient storage to provide flood prevention and to enhance and improve environmental quality and recreational opportunities within the area. The project included identification of land usage, hydrological modeling, detention basin design, land acquisition studies, and design of control structures.

Construction cost was approximately $3 million.