Interstate 10 at the Interstate 610 Interchange

The Louisiana Department of Transportation & Development selected BKI to provide preliminary and final plans for adding one lane in each direction of this two (2) miles of urban interstate. The project was divided into two contracts and included interchanges with I-610 and Metairie Road along I-10.

The I-10/I-610 interchange included reconstruction of elevated I-10/I-610 split over the 17th-Street Canal. The new structure consisted of mainly pre-stressed concrete girders spans and one three-span continuous curved steel girder span unit. Due to a drainage requirement, drainage design included 3-ft. slabs over the 17th Street Canal. The condition that a minimum of two lanes of traffic in each direction be kept operating while construction was performed over the existing alignment made the construction sequence a key aspect of the project.

As part of an environmental assessment included in this project, BKI conducted a comprehensive series of traffic counts along this 10-mile length of interstate, analyzed the data, and prepared a detailed series of recommendations to address congestion problems. BKI also performed a detailed noise study and recommended noise barriers be constructed throughout the corridor.

Construction cost was approximately $27 million.